France’s tertiary decree: after the 30 September 2026 OPERAT deadline

2025 consumption had to be declared. The question left open is who acts before the next campaign.

France’s tertiary decree: after the 30 September 2026 OPERAT deadline
energybuildingOPERATOCTOWISE

On 30 September 2026, parties subject to France’s tertiary decree had to declare 2025 energy consumption on OPERAT. The scheme, known as Éco Énergie Tertiaire, covers buildings, parts of buildings, and groups of buildings with at least 1,000 square metres of tertiary activity. That date does not close the subject. For a portfolio manager, it opens the useful question: does the declared data still allow a decision before the next campaign.

What the 30 September deadline closed

Two paths lead to the target. In relative terms, final energy consumption must fall by 40% by 2030, by 50% by 2040, and by 60% by 2050, against a reference year. In absolute terms, it must go under a threshold in kilowatt-hours per square metre per year, set by activity. The annual declaration covers year N, by 30 September of year N+1 at the latest. 2025 consumption was therefore due on 30 September 2026. A late filing gets regularized. It is not a substitute for a reliable series.

Since 1 July 2026, the annual attestation must be displayed in the building, somewhere visible, or shared by a means suited to the activity. It carries the Éco Énergie Tertiaire rating. Display makes visible a gap that many portfolios only looked at once a year, at filing time. The order of 11 August 2026, applicable since 20 August, also corrects missing values in the absolute-target calculation for some activity subcategories. The useful reflex is to check whether the site’s activity is in the corrected set: a wrong absolute value spreads through the whole trajectory.

The reference year is set before 30 September 2027

The next structural deadline is 30 September 2027. That is when 2026 consumption is declared. In the consolidated text, it is also the date by which the reference year must be filled in. It is chosen between 2010 and 2022, or it is the first full year of operation. If it is not filled in before that date, the reference becomes the consumption of the first full year whose data was reported on OPERAT. A poorly chosen year shifts the 2030 target before the first works.

The check that the 2030 target has been met is set for 31 December 2031 at the latest, on the basis of the declarations. Until then, an annual campaign measures. It does not say which site is drifting during the year, or whether the corrective action was carried out. The useful material is a series that can be compared from one building to another, and a trace of what was done, at what cost.

From the annual declaration to a decision on the portfolio

At EnerJ-meeting Lyon, on 15 September 2026, questions at the OCTOWISE stand were already about that passage: who sees the drift, who decides, and where the data stays. We had written it in Building energy: from meters to decisions. The account of the day is in EnerJ-meeting Lyon 2026. The OPERAT declaration and in-year monitoring do not answer the same question. The first records. The second still allows action on the year that will be declared next.

OCTOWISE, Programini’s product for building energy, is installed on the manager’s side. Consumption and files stay on that instance. The tertiary decree does not ask for one more chart. It asks, by 30 September 2027, for a reference year that holds, and by 2030, for a reduction that can be tied to actions. After the 30 September 2026 deadline, that is where an up-to-date file and a run portfolio part ways.